USSCrazybat said:
Hi all,
Still trying to educate myself about the platform, but one of the things that I'm curious about is the necessity for stepdown transformers, as well as how switching PSUs come into this. From what I can tell stepdowns are still very much in use for some restorations, but I'm wondering why they are needed when many PSUs can go between 220/110 at the flick of a switch. Can I really just get a standard £25 switching PSU and then I'm good as far as standard JAMMA is concerned?
the switch on a switchmode PSU is solely to set the correct input voltage usually around 220 -250 vac the RELEVENT SWITCH you mention allows you to use these PSUs if you live in a country or on temporary generators etc, where YOUR MAINS SUPPLY IS in region of 110 vac
the OUTPUTS of that psu will then be +5v dc and +12v dc as shown on the connection panel .. the unit has a transformer with dual winding to allow this to be set according to your personal supply voltage ,, ie in the USA or parts of Europe input voltages are around 100 to 120v
STEPDOWN TRANSFORMERS often referred to in technical queries and refurb summaries etc. is USUALLY IN RELATION TO SUPPLYING AN APPROPRIATE VOLTAGE TO THE CRT MONITOR ONLY (and or lighting where necessary for header illumination) ........... MANY MONITORS IN OLDER CABINETS HAVE MONITORS FED BY 100v or 120/128vac STEPDOWNS or 'ISOLATION' TRANSFORMERS purely because they cannot be used on mains 250v supply
if you are not familiar with this ........ ??........ then observe the monitor you have in place or wish to use? ........... where the supply connection enters the monitor you will usually and most often see 2 wires or a 3 pin plug ....... ON THE 3 PIN (as in the case of hantarex polo for example) the earth must also be present and these will usually be 250v ac supply to run style monitors
on wells gardner and hitachi and toei etc used in older games and especially cocktail table videos the feed is 2 wires only and this is an indication of around 100 v ac feed required and requires the NECESSARY STEPDOWN TO 100v from 250 v TRANSFORMER which itself is earthed to its casing from the input supply AND JUST 2 wires of 100v EXIT TO THE MONITOR and where appropriate the monitor frame can (if required) be earthed independenty tho will usually run safely without
on Hantarex 9000 and some other older models the chassis of the monitor is fed with 2 separate voltages via a 4 pin green plug connector and work best on around 128v ac and need a specific STEPDOWN for this voltage (tho they will run on a range from 100 - 135 ) and TWO PINS of the plug supply that voltage while the other 2 pins supply mains 250v to connect with the degauss demagnetising coil attatched to the back of the tube ... the mains voltage feeds this wire with 250v to demagenetise the screen ... tho again ON SOME OLDER CABINETS AND COCKTAILS especially there is sometimes a separate degauss button which can be pressed if required and often only exists on cabinets where an 'automatic' degauss is not employed
the STEPDOWN is also often termed as an ISOLTION transformer as it does in fact detatch any subsequent escaping high voltage from your mains input and some people even query as to whether to fit an isolation transformer when using a 250v ac supplied chassis .......... NOT ESSENTIAL and if you try to acquire one they are NOT normally easy to find for that reason 250v to 250v and in reality ... EVEN IN THE EYES OF THE OVER CAUTIOUS of hobbyists/owners and members the plug fuse protects both ways and can be as low as 5 AMP .....fitted in a 13 AMP square pin UK PLUG and is what I usually fit its standard procedure for many operators of fruits and arcades on commercial premises .. EUROLEADS (kettle / computer style) usually come with 5 amp fuses installed...
some people have said ..........but - what if that possible stray voltage, in the event of a monitor fault, goes to the swithmode and onward to my treasured game pcb .......... well..... most switchmodes will also be fuse protected also.....and will not allow too high voltages to pass through. ...
to clarify .. the input ac on the switchmode is INPUT ONLY which should be connected LIVE / NEUTRAL in addition to any earth USUALLY LABELLED AS 'FG' field ground terminal from the supply ....and if its shared onward to any other part of the machine any switch option on the switchmode would have NO EFFECT ON SUPPLY the switch option is for REGIONAL CONSIDERATION ONLY
69er2018-02-03 17:27:36