Favorthebrave
Newbie
Hi
Yeah pretty much that, but 2 vacuum cleaners, but not my wife’s cause she would kill me
I plan to build a vacuum chamber and place the mould on top
Then drop a frame with an abs sheet in at 200oC over the top then switch on both vacuums
Basically that’s how we do it with car dashboards
Yeah pretty much that, but 2 vacuum cleaners, but not my wife’s cause she would kill me
I plan to build a vacuum chamber and place the mould on top
Then drop a frame with an abs sheet in at 200oC over the top then switch on both vacuums
Basically that’s how we do it with car dashboards