K1ngarth3r
Active member
I need some help / reassurance that my thought process is correct.
I have a MVS-4-25 Revision 3 that Ive owned for a number of years, it came with a PC power supply, Hanterax 9110 monitor, wrong coin door and missing wiring to bits and bobs.
I'm finally getting around to tidying it up and, ideally I would like to rewire everything back to factory specs.
My main focus for this thread is making sure my wiring looks ok for swapping the monitor over from the 9110 to the Wells Gardner K7000.
Here's a simple diagram which shows how things are wired up (You can see it's for 240v).
I would like things to run on 120v and use a step down... Yes I'm a wierdo...
Assuming the K7000 takes 120v and not 220v this is how I propose to do it:
(If the K7000 needs 220v I would wire it to there instead).
Does this look right? Am I missing anything?
K1ngarth3r2020-02-05 09:37:50
I have a MVS-4-25 Revision 3 that Ive owned for a number of years, it came with a PC power supply, Hanterax 9110 monitor, wrong coin door and missing wiring to bits and bobs.
I'm finally getting around to tidying it up and, ideally I would like to rewire everything back to factory specs.
My main focus for this thread is making sure my wiring looks ok for swapping the monitor over from the 9110 to the Wells Gardner K7000.
Here's a simple diagram which shows how things are wired up (You can see it's for 240v).
I would like things to run on 120v and use a step down... Yes I'm a wierdo...
Assuming the K7000 takes 120v and not 220v this is how I propose to do it:
(If the K7000 needs 220v I would wire it to there instead).
Does this look right? Am I missing anything?
K1ngarth3r2020-02-05 09:37:50